The Lantern is a block of apartments recently built by Rouf Homes, it features balconies, a secure gated undercover parking, a landscaped communal garden and much more!
After a period of pre-construction with Rouf Homes, BA Systems commenced onsite in April 2021. The scope consisted of the B20 vertical bar infill system on the internal side of the stairwells. This was complimented with a stainless steel wall-mounted handrail on the outside. Externally, the B50 vertical bar system was used as a balcony balustrade to close of the openings in the brick facade.
Project Achievements
-
Modular Panels
Modular panels were used and fitted with resin fixings into the brick façade to allow for a very quick install process and to minimise penetrations through the external cooping and waterproofing membrane.