Saracens Secondary School
Saracens Secondary School – New Secondary School Building in Corner Mead, London.
Situated in North West of London, just 15 minutes from Brent Cross lies the all new Saracens Secondary School. The Secondary School includes classrooms, a sports hall, canteen, kitchen, staff rooms, playing courts, new offices, parking and landscaping works and is on the site of the ‘Former Barnet College’.
We have been pleased to support the project in providing the full balustrade package. Working alongside our client – Bowmer and Kirkland, our correspondence began at Pre-Contract Stages were we provided initial costing and design support. Once in contract we had further dialogue with the B&K team to propose our final solution;
- B20 Stainless Steel and Glass Infill Balustrades to Stair and Atrium Voids
- B10 Wall Handrails to Stairs
These systems were provided to all 4 Staircases and Atrium Levels 1 & 2, covering a total meterage of £247.9M!
Specification Details
-
Balustrade Infill
11.5mm thick clear toughened and laminated glass
-
Balustrade Height
1100mm on the stairs and 1500mm high on the level atrium voids
-
Design Load
1.5kN/m on the stairs and level atrium balustrades
-
Handrail
42mm diameter satin stainless steel offset handrail