Centrum Building – Project 26
Project 26 is a brand new commercial research and development building recently completed, situated on the Norwich Research Park. The development is paving the way for advancing a thriving research and innovation campus over the next decade and beyond.
The building was designed and built to a very high standard throughout, with quality materials and workmanship on display. For the balustrading in the staircase and void areas, frameless glass with exposed stainless steel handrails was specified.
BA Systems B40 structural glass with stainless steel handrails were chosen and installed, providing a high quality finished product. The systems complement the clinical design and atmosphere of the new building and reflect the clear, clean lines of the design.
B A Systems are delighted to have been associated with this prestigious research centre project
Project Achievements
A premium specification project which was meticulously planned and then was installed in record time on site
-
3D CAD Facility
Using our in-house 3D CAD facility, rendered images were supplied along with drawings to help clients visualise the finished product at approval stage then accurate three-dimensional drawings were produced from site surveys.
-
Fast Installation
With careful planning & project co-ordination with the main contractor, our highly experienced fitting team were able to install the entire glass balustrade in only 3 days.