BA Systems BA Systems
01/10

Maritime

BA Systems were contracted to provide the balustrades and handrails for the country’s largest privately owned container transport operator in their new commercial headquarters located in Felixstowe.

Due to the location and the type of business, the design brief called for a ‘nautical look’.

How was this achieved? BA Systems response to this was their wire infill system, comprising B20 stainless steel handrails and uprights with wire infills. This system was used extensively throughout the building terraces.

B20 Stainless steel uprights and handrails with toughened glass infill panels, were also specified and installed in the void areas.

 

Project Achievements

The installation program on site was to a very tight deadline. This presented a challenge for the production team and the on-site operation team. Once again B A Systems rose to the challenge. Using their well-proven manufacturing systems and contract management skills the project was completed on time for another satisfied customer.